Environmentalists sue over US approval of ioneer's Nevada lithium mine
By Nate Raymond and Ernest Scheyder
Oct 31 (Reuters) -Environmental and Indigenous groups on Thursday filed a lawsuit challenging the U.S. Interior Department's approval of ioneer's INR.AX Rhyolite Ridge lithium mine in Nevada, the first domestic source of the battery metal to be permitted by Democratic President Joe Biden's administration.
In a lawsuit filed in federal court in Las Vegas, groups including the Center for Biological Diversity argued the project posed an existential risk to the rare wildflower Tiehm’s buckwheat and could drive it to extinction.
They said the mine would also adversely impact groundwater, springs, wetlands, air quality, cultural resources and wildlife habitat and would transform a remote part of rural Nevada into a sprawling industrial complex.
Yet the groups said the Interior Department's Bureau of Land Management approved the mine without ensuring it would not jeopardize the wildflower or unduly impact the environment in violation of the National Environmental Policy Act, the Federal Lands Policy and Management Act, and the Endangered Species Act.
The Interior Department and ioneer did not immediately respond to requests for comment.
The Australia-based critical minerals miner received approval for the mine last week following a more-than six-year review process during which regulators, ioneer and conservationists tussled over the fate of Tiehm’s buckwheat.
The permit cleared the way for development of a mine that will become a key supplier to Ford Motor F.N and other electric-vehicle manufacturers. It was issued amid a flurry of recent moves by Biden administration officials to support critical minerals production and offset China's market dominance.
The permit also unlocked a $700 million loan from the U.S. Department of Energy, as well as a $490 million equity investment from Sibanye Stillwater SSWJ.J to fund the project.
The Interior Department said when it approved the mine that it had taken numerous steps to protect the ecosystem near the mine site, roughly 225 miles (362 km) north of Las Vegas.
The project contains enough lithium to power roughly 370,000 EVs each year. Construction is slated to begin next year, with production commencing by 2028.
Reporting by Nate Raymond in Boston and Ernest Scheyder in Houston
Editing by Matthew Lewis
免责声明: XM Group仅提供在线交易平台的执行服务和访问权限,并允许个人查看和/或使用网站或网站所提供的内容,但无意进行任何更改或扩展,也不会更改或扩展其服务和访问权限。所有访问和使用权限,将受下列条款与条例约束:(i) 条款与条例;(ii) 风险提示;以及(iii) 完整免责声明。请注意,网站所提供的所有讯息,仅限一般资讯用途。此外,XM所有在线交易平台的内容并不构成,也不能被用于任何未经授权的金融市场交易邀约和/或邀请。金融市场交易对于您的投资资本含有重大风险。
所有在线交易平台所发布的资料,仅适用于教育/资讯类用途,不包含也不应被视为用于金融、投资税或交易相关咨询和建议,或是交易价格纪录,或是任何金融商品或非应邀途径的金融相关优惠的交易邀约或邀请。
本网站上由XM和第三方供应商所提供的所有内容,包括意见、新闻、研究、分析、价格、其他资讯和第三方网站链接,皆保持不变,并作为一般市场评论所提供,而非投资性建议。所有在线交易平台所发布的资料,仅适用于教育/资讯类用途,不包含也不应被视为适用于金融、投资税或交易相关咨询和建议,或是交易价格纪录,或是任何金融商品或非应邀途径的金融相关优惠的交易邀约或邀请。请确保您已阅读并完全理解,XM非独立投资研究提示和风险提示相关资讯,更多详情请点击 这里。